Description
Road construction of about 9.5 km section of the maim Heraklion - Messara route in Crete, between the villages of Santa Barbara and Apomarma (about 22 km south from Heraklion).
The project includes:
- 9.5 km new road construction
- Completion St. Barbara tunnel
- Construction of St. Barbara bridge, length 250 m
- Shoring and soil reinforcement
- Detouring of the local road to Panassos village and the accompanying technical works
- Construction of the interchanges of Panasos and Gergeri
- Stabilization of the excavation slopes
- Sewage and drainage networks
- Road signes
- Street lighting
Watch the video in high resolution