EGNATIA HIGHWAY: KOULOURA - KLIDI (6.0)

Location GREECE, CENTRAL MACEDONIA
Client EGNATIA ODOS SA
Contractor EKTER S.A.
Participation 100%
Construction Period 01/2000-01/2002
Project value 43,175,000.00

Description

The project consists of  the construction of a second branch and a separation isle with a total length of 25,14km in the existing constructed branch of 13,5m width from Klidi to Kouloura. The new highway will have a total width of 24,5m and will consist of two traffic lanes and one emergency lane in each direction with a central isle of 4,5m width. The project also includes the construction of several bridges, parallel and vertical highways as well as other technical works.
Technical Data:

  • Total length:  25,14 km
  • Earthfill volume: 700.000 m³
  • Embankment: 1.750.000 m³
  • Road pavement: 2.032.500 m²
  • Asphalt pavement: 5.825.000 m²
  • Four(4) bridges along the length of the highway:46m, 59m, 55m, & 138m long spans respectively
  • Under-passages : four (4) 6m span each
  • Small technical works: 29 drains of several dimensions